TELEGRAM

Monday, December 26, 2011

RAILWAY TRACK TRACER PROJECT FREE DOWNLOAD

Posted by Anonymous at 7:19 PM 2 Comments
INTRODUCTION
In history of railways , almost 90% of the accidents happens because of two reasons:
  • Train comes away from track
  • Track discontinuity
TRAIN COMES AWAY FROM TRACK
It means that track is not all problems but train moves out of track. This happens because Of lack of concentration of the people who works with track.  For example when the nuts and bolts get loosed these sorts of problems will occur, where property loss will happen to both public and railways but not that much as the second case.  
TRACK DISCONTINUITY
i) This happens because of terrorism attack, natural disaster. There will be damage to track which causes severe damage to both public and railways which in many cases have led to several deaths.
ü) By keeping such issues in mind, we have come up with an idea to detect the track discontinuity very sooner before the train reaches the accident zone.
OBJECTIVE
Our project “railway track tracer” automatically traces the track discontinuity several kilometers ahead and alarms near by station and the Train about the track discontinuity.
ABSTRACT
  • In our project, we use series of sensors which senses the continuity of the track by sensing the vibration in the track.
  •  When a train passes its vibration in track it travels with very great velocity than the train velocity so that it can be detected several kilometers ahead before the train.
METHODOLOGY
Overview
In our project we use a series of sensors which detect the vibrations from the track. The output of the sensors are fed to the switching and rectifying circuit which processes the sensed signal ready to feed for the microcontroller. The processed signals are first fed to the opto couplers, output of which is fed to the microcontroller. The microcontroller decides from the received signal about the track discontinuity, and when a discontinuity is found in the track.
Block diagram for Railway track tracer
Block 1: Series of Sensors
We place the sensors at regular intervals in the track which senses the vibrations in the track when a train arrives. When a train moves with greater velocity the vibrations are experienced in the track for few kilometers ahead. The sensors capture these vibrations and pass them for processing.
Block 2: Switching and the Rectifying circuit
Every single sensor output is fed to a switching and rectifying circuit to determine the strength of vibration from the sensor and to process it to be suitable for the next level. Every switching circuit and the sensor pair is considered as a set (S1, S2, S3 and so on). Every set is connected to the microcontroller with suitable processing.
Block 3: Couplers
The couplers are the bridge between microcontroller and the switching circuit which prevents the microcontroller getting damaged from the high voltages.
Block 4: Microcontrollers
We use series of the microcontrollers to decide the defect area and the defect in the track.
Every slave microcontrollers (M1, M2, M3 and so on) are connected directly to the output of the few sets (S1, S2, S3) and the masters are connected to many slave microcontrollers. The slave micro controller decides the defect from processed signal. And the master controller detects the exact location of the defect area.
Block 5: Alarm signal
When a defect is detected the master signal is generated from the master controller which is connected to a necessary alarm device to warn the control room of the railways or the near by station or the train itself.
Tags:

Share This Post

Get Updates

Subscribe to our Mailing List. We'll never share your Email address.

2 comments:

  1. plzz can u provide circuit diagram of this project......????

    ReplyDelete
  2. sir i want to work on this project as my final year project.so please provide me complete data about this project along with circuit diagram and programing.if u mail the data on my email id then i shell b very thankful to you.this is my email id
    engr.uzi.ar@gmail.com

    ReplyDelete

THANKS FOR UR COMMENT ....

Categories

Labels

AERONAUTICAL AEROSPACE AGRICULTURE ANDROID Android project titles Animation projects Artificial Intelligence AUTOMOBILE BANK JOBS BANK RECRUITMENTS BIG DATA PROJECT TITLES Bio instrumentation Project titles BIO signal Project titles BIO-TECHNOLOGY BIOINFORMATICS BIOMEDICAL Biometrics projects CAREER CAT 2014 Questions CHEMICAL CIVIL Civil projects cloud computing COMP- PROJ-DOWN COMPUTER SCIENCE PROJECT DOWNLOADS COMPUTER(CSE) CONFERENCE Data mining Projects Data protection. Design projects DIGITAL SIGNAL PROCESSING IEEE Project titles Dot net projects EBOOKS ELECTRICAL MINI PROJECTS ELECTRICAL PROJECTS DOWNLOADS ELECTRONICS MINI PROJECTS ELECTRONICS PROJECT DOWNLOADS EMG PROJECTS employment Engineering projects Exams Facts final year projects FOOD TECHNOLOGY FREE IEEE 2014 project Free IEEE Paper FREE IEEE PROJECTS GATE GAte scorecard GOVT JOBS Green projects GSM BASED Guest authors HIGHWAY IEEE 2014 projects ieee 2015 projects IEEE computer science projects IEEE Paper IEEE PAPER 2015 ieee project titles IEEE projects IEEE Transactions INDUSTRIAL INNOVATIVE PROJECTS INTERFACING IT IT LIST Java projects labview projects LATEST TECHNOLOGY list of project centers Low cost projects m.com MARINE Matlab codes MATLAB PROJECT TITLES MATLAB PROJECTS MBA MBA 2015 projects MCA MECHANICAL MECHANICAL PROJECTS DOWNLOAD MINI PROJECTS modelling projects MP3 MP3 cutter Mp4 Networking topics ns2 projects online jobs PETROCHEMICAL PHYSIOLOGICAL MODELLING projects physiotheraphy Projects Power electronics power system projects PRODUCTION project centers project downloads Prosthesis projects RAILWAY RECRUITMENT 2012 Recent RECENT TECHNOLOGY RECENT TECHNOLOGY LIST RECRUITMENT Rehabilitation projects renewable power respiration projects RESUME FORMAT. Ring Tone Cutter Robotics projects. Robots in medical social network jobs Solar projects Songs Cutter Speech-music separation-Abstract structural engineering TECHNOLOGY technology management TELE COMMUNICATION Telegram project TEXTILE TOP ENGINEERING COLLEGES Training VLSI

Disclaimer

This blogs is an effort to club the scattered information about engineering and project titles and ideas available in the web. While every effort is made to ensure the accuracy of the information on this site, no liability is accepted for any consequences of using it. Most of the material and information are taken from other blogs and site with the help of search engines. If any posts here are hitting the copyrights of any publishers, kindly mail the details to educations360@gmail.com It will be removed immediately.

Alexa Rank

back to top